Table 3

Results of hazard analysis for the JIT and current situation

Sub-stepsHazardsControlled hazardsHigh-risk hazardsControlled high-risk hazards
Main stepJITCurrentJITCurrentJITCurrentJITCurrentJITCurrent
Necessity75232512261042
Preparation at CSSD39742
Transport to OR33200
Preparation in OR8720149114761
Use in OR5712202161300
Transport to CSSD4411000000
Sterilisation6664314221
Transport to OR51000
Total3634746535 (47%)5 (8%)343214 (41%)4 (13%)
Total risk score556556348369
  • CSSD, Central Sterile Supply Department; JIT, Just in time; OR, operating room.